summaryrefslogtreecommitdiffstats
path: root/kernel/sched/deadline.c
diff options
context:
space:
mode:
authorJoel Fernandes <joelaf@google.com>2017-07-13 04:24:29 +0200
committerIngo Molnar <mingo@kernel.org>2017-07-14 10:35:16 +0200
commit193be41e33168a3a06eb9d356d9e39c69de161d2 (patch)
treed05438997d25f84190b2d7ee57f0637613c1fd3a /kernel/sched/deadline.c
parentsched/cputime: Don't use smp_processor_id() in preemptible context (diff)
downloadlinux-193be41e33168a3a06eb9d356d9e39c69de161d2.tar.xz
linux-193be41e33168a3a06eb9d356d9e39c69de161d2.zip
sched/deadline: Fix confusing comments about selection of top pi-waiter
This comment in the code is incomplete, and I believe it begs a definition of dl_boosted to make sense of the condition that follows. Rewrite the comment and also rearrange the condition that follows to reflect the first condition "we have a top pi-waiter which is a SCHED_DEADLINE task" in that order. Also fix a typo that follows. Signed-off-by: Joel Fernandes <joelaf@google.com> Reviewed-by: Daniel Bristot de Oliveira <bristot@redhat.com> Acked-by: Juri Lelli <juri.lelli@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Link: http://lkml.kernel.org/r/20170713022429.10307-1-joelaf@google.com Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'kernel/sched/deadline.c')
-rw-r--r--kernel/sched/deadline.c14
1 files changed, 8 insertions, 6 deletions
diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c
index a84299f44b5d..755bd3f1a1a9 100644
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -1392,17 +1392,19 @@ static void enqueue_task_dl(struct rq *rq, struct task_struct *p, int flags)
struct sched_dl_entity *pi_se = &p->dl;
/*
- * Use the scheduling parameters of the top pi-waiter
- * task if we have one and its (absolute) deadline is
- * smaller than our one... OTW we keep our runtime and
- * deadline.
+ * Use the scheduling parameters of the top pi-waiter task if:
+ * - we have a top pi-waiter which is a SCHED_DEADLINE task AND
+ * - our dl_boosted is set (i.e. the pi-waiter's (absolute) deadline is
+ * smaller than our deadline OR we are a !SCHED_DEADLINE task getting
+ * boosted due to a SCHED_DEADLINE pi-waiter).
+ * Otherwise we keep our runtime and deadline.
*/
- if (pi_task && p->dl.dl_boosted && dl_prio(pi_task->normal_prio)) {
+ if (pi_task && dl_prio(pi_task->normal_prio) && p->dl.dl_boosted) {
pi_se = &pi_task->dl;
} else if (!dl_prio(p->normal_prio)) {
/*
* Special case in which we have a !SCHED_DEADLINE task
- * that is going to be deboosted, but exceedes its
+ * that is going to be deboosted, but exceeds its
* runtime while doing so. No point in replenishing
* it, as it's going to return back to its original
* scheduling class after this.