summaryrefslogtreecommitdiffstats
path: root/Documentation/scheduler/sched-design-CFS.txt
diff options
context:
space:
mode:
Diffstat (limited to 'Documentation/scheduler/sched-design-CFS.txt')
-rw-r--r--Documentation/scheduler/sched-design-CFS.txt7
1 files changed, 1 insertions, 6 deletions
diff --git a/Documentation/scheduler/sched-design-CFS.txt b/Documentation/scheduler/sched-design-CFS.txt
index 8239ebbcddce..99961993257a 100644
--- a/Documentation/scheduler/sched-design-CFS.txt
+++ b/Documentation/scheduler/sched-design-CFS.txt
@@ -164,7 +164,7 @@ This is the (partial) list of the hooks:
It puts the scheduling entity (task) into the red-black tree and
increments the nr_running variable.
- - dequeue_tree(...)
+ - dequeue_task(...)
When a task is no longer runnable, this function is called to keep the
corresponding scheduling entity out of the red-black tree. It decrements
@@ -195,11 +195,6 @@ This is the (partial) list of the hooks:
This function is mostly called from time tick functions; it might lead to
process switch. This drives the running preemption.
- - task_new(...)
-
- The core scheduler gives the scheduling module an opportunity to manage new
- task startup. The CFS scheduling module uses it for group scheduling, while
- the scheduling module for a real-time task does not use it.